References - Waste- and Stormwater Projects
Davutlar-Güzelçamlı (AYDIN) Sewerage Project
Date: 2006 - 2007
The project of the wastewater collection network system of the Counties, Davutlar – Güzelçamlı.
OWNER OF THE PROJECT
General Directorate of Bank of Provinces
FINANCIER OF THE PROJECT
General Directorate of Bank of Provinces
DESCRIPTION OF THE PROJECT
Considering the topographical structure of the area and approved site works and the fact that the treatment of the wastewater collected from both Counties is included in KUŞATAK Project, the transmission of wastewater to wastewater treatment plant is projected by using four separate pumping stations; three of them in the collector line, one of them in transmission line to the plant.
In the Project, the collector line and the network are composed of pipes with diameters of Ø200, Ø300, Ø400, Ø500, Ø600, Ø700, Ø800, Ø1000, Ø1200 mm and the total length of 158 km for the first phase and 210 km for the second phase.
Project Total Population : 171,000 ca
Project Total Flowrate : 550 l/s
Total Collector Line : 25,200 m
M.K.E. Barutsan Elmadağ and Rocket Factory Wastewater Discharge Lines
Date: 2005 - 2006
Eryaman (ANKARA) 8.& 9. Stage Housing Storm Water & Sewerage Project
Date: 2004 - 2005
ANKARA Eryaman 7. Stage Housing Stormwater & Sewerage Project
Date: 2004 - 2005
ŞANLIURFA Org, Ind. Site Sewerage & Storm Water Implementation Project
Date: 1991 - 1994
Kocadere – Koruköy – Esenköy – Çınarcık (İSTANBUL) Sewerage Project
Date: 1991 - 1994