References - Drinking Water Projects

Bazian Cement Factory,NORTH IRAQ Service Water Transmission Line Project
Location: Kuzey Irak
Date: 2007 - 2007


Sarıkamış (KARS) Regulator, Transmission Line, Reservoir Project
Location: Kars
Date: 2007 -


Details
Burhaniye (BALIKESİR) Transmission Line, Reservoir and Network Project
Location: Balıkesir
Date: 2006 - 2007


Due to the deficiency in the present drinking water system, of The County, Burhaniye, the project of transmission line and distribution network for the demand for the projection year, 2041.

OWNER OF THE PROJECT
General Directorate of Bank of Provinces

FINANCIER OF THE PROJECT
General Directorate of Bank of Provinces

DESCRIPTION OF THE PROJECT
The drinking water demand of the County, Burhaniye is currently being supplied by six present deep wells. In the new Project, the demand is planned to be supplied by the six present wells for the first 15-year-long period. After that date, the present resources would not be sufficient fo the demand and the alternative resources would be taken into consideration.
In the Project, the transmission line is composed of pipes with diameters of Ø110, Ø140, Ø160, Ø200, Ø225, Ø280, Ø355, Ø400, Ø450, Ø500, Ø630, Ø710 mm and the length of 270 km for the first phase and 70 km for the second phase.

Project Total Population : 193,400 ca
Project Total Flowrate : 455 l/s

Details
Şırnak Province Drinking Water Pproject
Location: Şırnak
Date: 2006 -


Due to the deficiency in the present drinking water system, of ŞIRNAK Province, the project of transmission line and distribution network for the demand for the projection year, 2040.

OWNER OF THE PROJECT
General Directorate of State Hydraulic Works

FINANCIER OF THE PROJECT
General Directorate of State Hydraulic Works

DESCRIPTION OF THE PROJECT
The drinking water demand of ŞIRNAK Province is currently being supplied by two springs and Şilerit Creek located in southwestern part. In the new Project, the demand is planned to be supplied by Mijin Spring located in eastern part of the Province which allows the tranmission by gravity.
The project is separated into two phases; for the 1st Phase 111,500 ca and 177 l/s and for the 2nd Phase 173,000 ca and 277 l/s .
In the Project, the transmission line is composed of pipes with pressure classes of PN16, 25, 40, 50, 60 and 70; diameters of Ø180, Ø225, Ø315, Ø355, Ø400, Ø450, Ø630 in PE pipes and Ø700 mm in steel pipes and the length of 56,6 km.

Project Population : 173,000 ca
Project Flowrate : 547 l/s

Maden (ELAZIĞ) Transmission Line and Network Project
Location: ELAZIĞ
Date: 2006 - 2007


Bayır (MUĞLA) Transmission Line Project
Location: Muğla
Date: 2005 - 2006


Esenköy (YALOVA) Regulator, Transmission Line, Reservoir& Network Project
Location: Yalova
Date: 2005 - 2007


ANKARA Eryaman 8. & 9. Stage Housing Network Project
Location: Ankara
Date: 2004 - 2005


ANKARAEryaman 7. Stage Housing Network Project
Location: Ankara
Date: 2004 - 2005


ANKARA Eryaman 6. Stage Housing Network Project
Location: Ankara
Date: 2004 - 2004


Details
Aralık, Halfeli, Hoşhaber, Melekli, Karakoyunlu, Taşburun (IĞDIR) Group Transmission Line Project
Location: Iğdır
Date: 2000 - 2001


Due to the deficiency in the present drinking water system, of The Counties, Aralık, Halfeli, Hoşhaber, Melekli, Karakoyunlu, Taşburun, the project of transmission line and distribution network for the demand for the projection year, 2036 by using the Keklikpınarı, Gürgüre ve Hıdırlı Springs in the easthern part of the City, IĞDIR as the water resource.

OWNER OF THE PROJECT
General Directorate of Bank of Provinces

FINANCIER OF THE PROJECT
General Directorate of Bank of Provinces

DESCRIPTION OF THE PROJECT
It is planned to be supplied totally Q = 750 l/s flow from the Keklikpınarı, Gürgüre and Hıdırlı Springs. Near the catchments constructed in Keklikpınarı, Gürgüre Spring, there is reinforced concrete curtain projected in order to protect the quality of water of the springs by prevent the drainage of the lake and storm water.
In Keklikpınarı Spring, the spring type catchment is to be applied, on the other hand, for Hıdırlı and Gürgüre Springs, special type catchment projects are designed with drainage collection systems.
It is projected 1100 m-long collection pipes and 1650 m-long drainflex pipes in Hıdırlı Spring, 200 m-long collection pipes and 200 m-long drainflex pipes in Gürgüre Spring in the Project.
In the Project, the transmission line is composed of pipes with diameters of Ø200, Ø250, Ø300, Ø350, Ø400, Ø600, Ø700, Ø800, Ø1000, Ø1200 mm and the length of 83.6 km made up of steel and asbestos concrete and 10 water reservoirs with the total volume of 25,100 m3.
In addition, there is steel bridge project used in two different part of the transmission line in order to hang the pipe line where there is a creek cross-pass.

Project Total Population : 275,000 ca
Project Total Flowrate : 750 l/s

Mürefte (TEKİRDAĞ) Reservoir, Network Project
Location: Tekirdağ
Date: 2000 - 2001


İznik (BURSA) Catchment, Transmission Line, Reservoir, Network Project
Location: Bursa
Date: 1999 - 1999


Konaklı – Türkler – Payallar (ANTALYA) Catchment, Transmission Line, Reservoir, Network Project
Location: Antalya
Date: 1998 - 1999


Taflan (SAMSUN) Reservoir, Network Project
Location: Samsun
Date: 1998 - 1998


Atkaracalar (ÇANKIRI) Reservoir, Network Project
Location: Çankırı
Date: 1997 - 1998


Emiruşağı (KAYSERİ) Catchment, Transmission Line, Reservoir, Network Project
Location: Kayseri
Date: 1997 - 1997


Doğanköy (TRABZON) Transmission Line, Reservoir, Network Project
Location: Trabzon
Date: 1997 - 1997


Ceylanpınar (ŞANLIURFA) Transmission Line, Reservoir, Network Project
Location: Şanlıurfa
Date: 1996 - 1996


Elmalı (NİĞDE) Catchment, Transmission Line, Reservoir, Network Project
Location: Niğde
Date: 1995 - 1996


Çeğet (TOKAT) Catchment, Transmission Line, Reservoir, Network Project
Location: Tokat
Date: 1995 - 1995


Kargıpınarı (İÇEL) Transmission Line, Reservoir, Network Project
Location: İçel
Date: 1994 - 1995


Kırlı (ORDU) Regulator and Transmission Line Project
Location: Ordu
Date: 1994 - 1993


Dalyan (MUĞLA) Catchment, Transmission Line, Reservoir, Network Project
Location: Muğla
Date: 1993 - 1993


Boztepe (KIRŞEHİR) Catchment, Transmission Line, Reservoir, Network Project
Location: Kırşehir
Date: 1993 - 1994


Toklumen (KIRŞEHİR) Catchment, Transmission Line, Reservoir, Network Project
Location: Kırşehir
Date: 1993 - 1994


Menderes (İZMİR) Transmission Line, Reservoir, Network Project
Location: İzmir
Date: 1993 - 1994


Kırlı (ORDU) Transmission Line, Network Project
Location: ORDU
Date: 1993 - 1994


Patnos (AĞRI) Catchment, Transmission Line, Transmission Line, Reservoir, Network Project
Location: Ağrı
Date: 1992 - 1993


Kanlıca (NEVŞEHİR) Catchment, Transmission Line, Reservoir, Network Project
Location: Nevşehir
Date: 1992 - 1993


Korkut (MUŞ) Catchment, Transmission Line, Reservoir, Network Project
Location: Muş
Date: 1992 - 1992


Şebinkarahisar (GİRESUN) Catchment, Transmission Line, Reservoir, Network Project
Location: Giresun
Date: 1992 - 1994


ŞANLIURFA Org. Ind. Area Transmission Line ve Network Project
Location: Şanlıurfa
Date: 1991 - 1994


Pehlivanlı (ERZURUM) Catchment, Transmission Line, Reservoir, Network Project
Location: Erzurum
Date: 1991 - 1993


Yatağan (DENİZLİ) Network Project
Location: Denizli
Date: 1991 - 1991


Çubuk (ANKARA) Transmission Line Project
Location: Ankara
Date: 1990 - 1992


Pozantı (ADANA) Catchment, Transmission Line Project
Location: Adana
Date: 1990 - 1991


Büyükgökçeli (ISPARTA) Catchment, Transmission Line Network Project
Location: Isparta
Date: 1990 - 1991


Kuşçu (KAYSERİ) Catchment, Transmission Line, Reservoir, Network Project
Location: Kayseri
Date: 1990 - 1991


Ören (MALATYA) Catchment, Transmission Line, Reservoir, Network Project
Location: Malatya
Date: 1990 - 1990


Saraykent (YOZGAT) Catchment, Transmission Line, Reservoir, Network Project
Location: Yozgat
Date: 1988 - 1989


Çanakçı (GİRESUN) Catchment, Transmission Line, Network Project
Location: Giresun
Date: 1987 - 1988


Altınkaya (NİĞDE) Catchment, Transmission Line, Reservoir, Network Project
Location: Niğde
Date: 1987 - 1987


Uğurlu (TRABZON) Transmission Line, Reservoir, Network Project
Location: Trabzon
Date: 1987 - 1988