References - Drinking Water Projects
Bazian Cement Factory,NORTH IRAQ Service Water Transmission Line Project
Date: 2007 - 2007
Sarıkamış (KARS) Regulator, Transmission Line, Reservoir Project
Date: 2007 -
Burhaniye (BALIKESİR) Transmission Line, Reservoir and Network Project
Date: 2006 - 2007
Due to the deficiency in the present drinking water system, of The County, Burhaniye, the project of transmission line and distribution network for the demand for the projection year, 2041.
OWNER OF THE PROJECT
General Directorate of Bank of Provinces
FINANCIER OF THE PROJECT
General Directorate of Bank of Provinces
DESCRIPTION OF THE PROJECT
The drinking water demand of the County, Burhaniye is currently being supplied by six present deep wells. In the new Project, the demand is planned to be supplied by the six present wells for the first 15-year-long period. After that date, the present resources would not be sufficient fo the demand and the alternative resources would be taken into consideration.
In the Project, the transmission line is composed of pipes with diameters of Ø110, Ø140, Ø160, Ø200, Ø225, Ø280, Ø355, Ø400, Ø450, Ø500, Ø630, Ø710 mm and the length of 270 km for the first phase and 70 km for the second phase.
Project Total Population : 193,400 ca
Project Total Flowrate : 455 l/s
Şırnak Province Drinking Water Pproject
Date: 2006 -
Due to the deficiency in the present drinking water system, of ŞIRNAK Province, the project of transmission line and distribution network for the demand for the projection year, 2040.
OWNER OF THE PROJECT
General Directorate of State Hydraulic Works
FINANCIER OF THE PROJECT
General Directorate of State Hydraulic Works
DESCRIPTION OF THE PROJECT
The drinking water demand of ŞIRNAK Province is currently being supplied by two springs and Şilerit Creek located in southwestern part. In the new Project, the demand is planned to be supplied by Mijin Spring located in eastern part of the Province which allows the tranmission by gravity.
The project is separated into two phases; for the 1st Phase 111,500 ca and 177 l/s and for the 2nd Phase 173,000 ca and 277 l/s .
In the Project, the transmission line is composed of pipes with pressure classes of PN16, 25, 40, 50, 60 and 70; diameters of Ø180, Ø225, Ø315, Ø355, Ø400, Ø450, Ø630 in PE pipes and Ø700 mm in steel pipes and the length of 56,6 km.
Project Population : 173,000 ca
Project Flowrate : 547 l/s
Esenköy (YALOVA) Regulator, Transmission Line, Reservoir& Network Project
Date: 2005 - 2007
Aralık, Halfeli, Hoşhaber, Melekli, Karakoyunlu, Taşburun (IĞDIR) Group Transmission Line Project
Date: 2000 - 2001
Due to the deficiency in the present drinking water system, of The Counties, Aralık, Halfeli, Hoşhaber, Melekli, Karakoyunlu, Taşburun, the project of transmission line and distribution network for the demand for the projection year, 2036 by using the Keklikpınarı, Gürgüre ve Hıdırlı Springs in the easthern part of the City, IĞDIR as the water resource.
OWNER OF THE PROJECT
General Directorate of Bank of Provinces
FINANCIER OF THE PROJECT
General Directorate of Bank of Provinces
DESCRIPTION OF THE PROJECT
It is planned to be supplied totally Q = 750 l/s flow from the Keklikpınarı, Gürgüre and Hıdırlı Springs. Near the catchments constructed in Keklikpınarı, Gürgüre Spring, there is reinforced concrete curtain projected in order to protect the quality of water of the springs by prevent the drainage of the lake and storm water.
In Keklikpınarı Spring, the spring type catchment is to be applied, on the other hand, for Hıdırlı and Gürgüre Springs, special type catchment projects are designed with drainage collection systems.
It is projected 1100 m-long collection pipes and 1650 m-long drainflex pipes in Hıdırlı Spring, 200 m-long collection pipes and 200 m-long drainflex pipes in Gürgüre Spring in the Project.
In the Project, the transmission line is composed of pipes with diameters of Ø200, Ø250, Ø300, Ø350, Ø400, Ø600, Ø700, Ø800, Ø1000, Ø1200 mm and the length of 83.6 km made up of steel and asbestos concrete and 10 water reservoirs with the total volume of 25,100 m3.
In addition, there is steel bridge project used in two different part of the transmission line in order to hang the pipe line where there is a creek cross-pass.
Project Total Population : 275,000 ca
Project Total Flowrate : 750 l/s
İznik (BURSA) Catchment, Transmission Line, Reservoir, Network Project
Date: 1999 - 1999
Konaklı – Türkler – Payallar (ANTALYA) Catchment, Transmission Line, Reservoir, Network Project
Date: 1998 - 1999
Emiruşağı (KAYSERİ) Catchment, Transmission Line, Reservoir, Network Project
Date: 1997 - 1997
Doğanköy (TRABZON) Transmission Line, Reservoir, Network Project
Date: 1997 - 1997
Ceylanpınar (ŞANLIURFA) Transmission Line, Reservoir, Network Project
Date: 1996 - 1996
Elmalı (NİĞDE) Catchment, Transmission Line, Reservoir, Network Project
Date: 1995 - 1996
Çeğet (TOKAT) Catchment, Transmission Line, Reservoir, Network Project
Date: 1995 - 1995
Kargıpınarı (İÇEL) Transmission Line, Reservoir, Network Project
Date: 1994 - 1995
Dalyan (MUĞLA) Catchment, Transmission Line, Reservoir, Network Project
Date: 1993 - 1993
Boztepe (KIRŞEHİR) Catchment, Transmission Line, Reservoir, Network Project
Date: 1993 - 1994
Toklumen (KIRŞEHİR) Catchment, Transmission Line, Reservoir, Network Project
Date: 1993 - 1994
Menderes (İZMİR) Transmission Line, Reservoir, Network Project
Date: 1993 - 1994
Patnos (AĞRI) Catchment, Transmission Line, Transmission Line, Reservoir, Network Project
Date: 1992 - 1993
Kanlıca (NEVŞEHİR) Catchment, Transmission Line, Reservoir, Network Project
Date: 1992 - 1993
Korkut (MUŞ) Catchment, Transmission Line, Reservoir, Network Project
Date: 1992 - 1992
Şebinkarahisar (GİRESUN) Catchment, Transmission Line, Reservoir, Network Project
Date: 1992 - 1994
ŞANLIURFA Org. Ind. Area Transmission Line ve Network Project
Date: 1991 - 1994
Pehlivanlı (ERZURUM) Catchment, Transmission Line, Reservoir, Network Project
Date: 1991 - 1993
Büyükgökçeli (ISPARTA) Catchment, Transmission Line Network Project
Date: 1990 - 1991
Kuşçu (KAYSERİ) Catchment, Transmission Line, Reservoir, Network Project
Date: 1990 - 1991
Ören (MALATYA) Catchment, Transmission Line, Reservoir, Network Project
Date: 1990 - 1990
Saraykent (YOZGAT) Catchment, Transmission Line, Reservoir, Network Project
Date: 1988 - 1989
Çanakçı (GİRESUN) Catchment, Transmission Line, Network Project
Date: 1987 - 1988
Altınkaya (NİĞDE) Catchment, Transmission Line, Reservoir, Network Project
Date: 1987 - 1987
Uğurlu (TRABZON) Transmission Line, Reservoir, Network Project
Date: 1987 - 1988










Visitor Count: 84514